Pull Out Test
Always ready to offer its customers the technical answer to their needs, the tecnical makes pull out tests on the basis of the company's specifications or drawing up internal specifications.
Pull out tests are carried out before the beginning of construction in order to have information about:
- TYPE OF PROFILE (HEB, IPE, C, Etc)
- INSTALLATION METHOD (BATCHING, PRE DRILLING, BALLASTED, etc.)
Subsequently, after choosing the methods described above, we continue with the execution of the texts to determine the following characteristics:
- Axial tests to determine the extraction force in the unit of time;
- Compression test for determining the driving load in the unit of time;
- Lateral tests for determining the lateral resistance in the unit of time;
These tests are performed using both analog and digital instrumentation, with valid calibration certification, using the support of mechanical contrast equipment.